WELCOME TO
We’re the UK’s number 1 supplier of Project EV electric car chargers, offering renewable energy solutions for customers with charging requirements at home or as part of their business.
DOWNLOAD PROJECT EV BROCHURE 2024
AC WALL MOUNTED CHARGERS
APEX 7.3KW
Fast AC Single Outlet 7.3kW Tethered & Untethered Chargers
Project EV Free App
Project EV Pro App
A world of colour
APEX 22KW
Fast AC Single Outlet 22kW Tethered & Untethered Chargers
Project EV Free App
Project EV Pro App
A world of colour
EVA-07S-S - EVA-07S-SE*
EV AC Charging Station (Single-Phase)
Project EV Free App
Project EV Pro App
RFID
EVA-07S-S-SE RFID - EVA-07S-SE RFID 4G
EV AC Charging Station (Single-Phase)
Project EV Free App
Project EV Pro App
RFID
EVA-22S-SE RFID - EVA-22S-SE 4G
EV AC Charging Station (Single-Phase) – EV AC Charging Station (Three Phase)
Project EV Free App
Project EV Pro App
RFID
EVA-07D-SE-W - DUAL WALL RANGE
7.3kW Pro Earth Wall AC Charger Dual Gun RFID [63a Single Phase]
Project EV Free App
Project EV Pro App
RFID
EVA-22D-SE-W - DUAL WALL RANGE
22kW Pro Earth Wall AC Charger Dual Gun RFID [63a Three Phase]
Project EV Free App
Project EV Pro App
RFID
AC FLOOR STANDING CHARGERS
EVA-07D-S RFID
EV AC Charging Station (Single-phase)
Project EV Free App
Project EV Pro App
RFID
EVA-22D-S RFID
EV AC Charging Station (Single-Phase)
Project EV Free App
Project EV Pro App
RFID
DC COMMERCIAL CHARGERS
EVD-40S-P RFID
40KW DC Charging Station (Three-phase)
Project EV Free App
Project EV Pro App
RFID
EVD-40D-CC | EVD-40D-CM
40KW DC Charging Station (Three-phase)
Project EV Free App
Project EV Pro App
RFID
EVD-60D-CM
60kW DC Charging Station (Three-phase)
Project EV Free App
Project EV Pro App
RFID
EVC-AC22S/DC60D
AC 22kW/ DC 60kW Charging Station (Three-phase)
Project EV Free App
Project EV Pro App
RFID
EVD-150D
150kW DC Charging Station
Project EV Free App
Project EV Pro App
RFID
EVC-AC44D/DC150D
150kW Floor DC Quad Gun RFID
Project EV Free App
Project EV Pro App
RFID
ACCESSORIES
PRO EARTH INTERFACE
125 amp Pro Earth Interface
Multiple Charge Connection
No Spike Required
PROJECT EV FLOOR STAND7KW / 22KW
EV-FLRSTAND
PROJECT EV FLOOR STAND40KW DC
EV-FLRSTAND
GROUND MOUNT
EV-GMEVA-S / EV-GMEVA-D / EV-GM40KW
PROTECTION BARRIERS
EV-POST2
ELECTRIC CAR CHARGING CABLE
Full range of cable capacities and lengths available
SIGNAGE
EV-SIGN1
CT CLAMP
EV-CTCLAMP
CHARGE POINT RFIDCARDS
EV-RFID
SINGLE PHASE METER
1PHM
THREE PHASE METER
3PHM
4G NETWORK MONITORING
EV-4G
RFID WRITER
EV-RFID WRITER
LOAD MANAGEMENT
We’re the UK’s number 1 supplier of Project EV electric car chargers, offering renewable energy solutions for customers with charging requirements at home or as part of their business.
DOMESTIC LOAD MANAGEMENT
COMMERCIAL LOAD MANAGEMENT
PROJECT EV FREE APP
CONTROL EVERYTHING
- Power flow management
- Load management feature
- Multiple mode control (via app, plug and go, RFID swipe card)
- Solar charging option
- Off-peak timed charging
- Charging inventory list for one or multiple chargers registered
- Securely authorise another person to use
- Manage and add multiple charge points to one master account
PROJECT EV PRO APP
PORTABLE PRO CRM
The Project EV Pro App is a unique EV charging platform, providing you the ability to utilise public charging capabilities and manage and control multiple chargers – from which you can generate a fluid revenue stream.
With our RFID function you can assign your staff a designated charging tag, creating a simple workplace charging scheme with the swipe of a card – allowing for more efficient monitoring of expenses costs.
The Project EV Pro App is a unique EV charging platform, providing you the ability to utilise public charging capabilities and manage and control multiple chargers – from which you can generate a fluid revenue stream.
PROJECT EV APP
CHARGE YOUR CAR WITH YOUR SOLAR
Solar export control works by utilising the exported energy produced by your solar PV panels, measuring the load in the property and sending the free unused power to the electric vehicle. This power would normally be exported to the grid and potentially wasted, however, diverting this unused power could result in charging your car for free.
Electric Vehicles could double your existing electricity bills, this is dependant on your mileage, there are multiple ways of reducing these costs with off-peak charging and installation of solar panels. A typical solar system rated at 4kw will provide approximately 3000Kwh which is enough power to charge most vehicles to 50%.
Drive up to 10000 miles. Project EV chargers have the ability to charge a vehicle with any unused exported power which would normally flow back to the grid by analysing the exact amount of unused power and charging the vehicle direct from the solar panels.
This gives all Project EV customers the opportunity to minimise their costs of charging. Project EV has a completely free design service to explore the benefits of solar, ensuring every electric vehicle purchaser has the ability to take advantage of charging their vehicle in the most economical way. Please enquire with your Project EV assessor today.
SOLAR EXPORT CONTROL
FAQ'S
Most common questions and answers
ARE THE CHARGE POINTS OZEV APPROVED?
Yes. Our charge points are OZEV approved.
HOW DO I OPERATE THE CHARGE POINT?
You have two or three options:
- Plug and Go. Your vehicle will start to charge as soon as you plug in. This is only recommended for secure locations such as inside a garage where only you can access the charge point.
- Free App. Our app allows you to start and stop charging, schedule charging hours for off-peak tariff as well as monitor your usage and cost. You can also add new users to allow them access to your charge point.
- RFID card* only applies to RFID versions. Use the RFID card to start and stop charging by tapping the charger, it’s that simple.
DO I NEED AN INTERNET CONNECTION?
In most cases the answer is yes. It is important to keep the firmware updated, which happens automatically when your charger has an internet connection. It also enables you to use the free App to operate the charger and monitor your usage and costs.
DO I NEED WIFI, LAN OR 4G TO CONNECT?
Every Project EV charge point is WiFi enabled and comes with and Ethernet LAN port as standard. Ethernet cable provides the most stable connection but WiFi is also good if you have a good signal back to the router. Use your phone to check the signal where you want to install the charger. If you have at least 2 bars, it should be suitable for WiFi connection. We also provide 4G versions for sites without internet access. You can provide your own data SIM card or we can provide a 5 year 4G data SIM.
DOES THE CHARGE POINT NEED TO BE WALL OR POST MOUNTED?
Our smaller charge points can be wall or post mounted. We can provide a mounting post, which can mount a single charger or two chargers back to back. Larger pedestal chargers are free-standing.
WHAT IS DYNAMIC LOAD BALANCING
Dynamic load balancing protects your incoming supply. It ensures that you don’t exceed the capacity of your incoming supply fuse rating. The charger reacts to alter the charge if necessary to ensure you don’t go over your limit and cause a power outage. This requires set-up on installation and a CT clamp or energy meter.
SHOULD I HAVE A TETHERED OR UNTETHERED UNIT?
Cable lock is unique to the Project EV range of untethered EV charge points. It’s the best of both worlds as it allows the user to lock their gun in the charge point, making it tethered for convenience with the ability to unlock for safety and security when required and select the cable length they need.
CAN THE CHARGER’S OUTPUT BE REDUCED?
Yes. You can set the output power limit on every Project EV charger in the App or via the Laptop interface. This is particularly useful for sites with multiple charge points using a limited supply.